Get Free Shipping on orders over $89
Make-To-Order Assembly Management - Rainer Kolisch

Make-To-Order Assembly Management

By: Rainer Kolisch, R. Kolisch

Hardcover | 4 December 2000

At a Glance

Hardcover


$169.00

or 4 interest-free payments of $42.25 with

 or 

Ships in 5 to 7 business days

Purchasing .Fabrication Assembly Distribution Figure 1.1: Multi-Level Manufacturing System for Make-to-Order Products specific resources of a type, i.e., a certain machine or a single worker, the determination of the sequence operations are processed on a ma­ chine, and the assignment of start and finish times to operations. We will modify this framework to be specifically suited for multi­ level make-to-order manufacturing systems. We assume that the facil­ ity design issue is settled, i.e., the location and the layout of the facility as well as the capacity ofthe three main resource types of the company are determined. These resource types are the engineering department, the fabrication department, and the assembly department. The engineering department is concerned with the construction of new products as well as the modification and customization of ex­ isting products. This entails the generation of engineering documents such as blue prints for manufacturing. The capacity of the engineering department is determined by the the count and qualification of engi­ neers and by the availability of construction devices such as computer aided design (CAD) systems etc.

Other Editions and Formats

Paperback

Published: 30th November 2010

More in Business Mathematics & Systems

A Guide to the Business Analysis Body of Knowledge - BABOK - IIBY
Business Analytics : 3rd Global Edition - James Evans

RRP $146.95

$108.99

26%
OFF
Business Statistics : 8th edition - Australia and New Zealand - Antony Selvanathan
Intermediate Financial Theory : 3rd Edition - Jean-Pierre Danthine

RRP $195.75

$190.99

Health Information : 5th Edition - Management of a Strategic Resource - Mervat Abdelhak