| List of Figures | p. viii |
| List of Tables | p. ix |
| List of Worksheets | p. ix |
| Preface | p. xiii |
| Introduction | p. xiv |
| How to Use The Six Sigma Planner | p. xiv |
| Planning | p. 1 |
| Develop the Project Charter | p. 1 |
| Project Charter | p. 1 |
| The Project Charter Document | p. 1 |
| Conduct a Feasibility Analysis | p. 5 |
| Is This a Valid Project | p. 5 |
| Feasibility Analysis Study | p. 8 |
| The Project Plan | p. 16 |
| Project Metrics | p. 16 |
| Refining the Dollar Opportunity Estimates | p. 20 |
| How Will I Monitor Satisfaction with Project Success? | p. 22 |
| Identify Human Resources Need to Complete the Project | p. 24 |
| Identify Other Resources Needed to Complete the Project | p. 27 |
| Work Breakdown Structures | p. 29 |
| Creating the WBS | p. 29 |
| Integration and Test | p. 32 |
| Project Schedule Development | p. 32 |
| Activity Definition | p. 35 |
| Activity Dependencies | p. 38 |
| Estimating Activity Duration | p. 40 |
| Gantt Charts | p. 42 |
| Network Diagrams | p. 46 |
| Resource Availability | p. 51 |
| Calendars | p. 51 |
| Schedule Improvement | p. 54 |
| Estimating Project Duration Statistically | p. 60 |
| Calculating the Cost of a Schedule | p. 66 |
| Resource Leveling | p. 70 |
| Project Control Subplans | p. 72 |
| Risk Control Plan | p. 72 |
| Quality Plan | p. 80 |
| Cost Control Plan | p. 84 |
| Schedule Control Plan | p. 87 |
| Project Schedule Management | p. 88 |
| Scope Change Control Plan | p. 90 |
| Change Control System | p. 90 |
| Define | p. 95 |
| What Is the Current State? | p. 95 |
| What's Wrong with the Way Things are Now? | p. 96 |
| Quantify the Undesirable Effects | p. 97 |
| Tools and Techniques | p. 97 |
| Failure Mode and Effect Analysis (FMEA) | p. 100 |
| FMEA Process | p. 100 |
| Process Metrics | p. 106 |
| Other Key Factors and Metrics | p. 110 |
| How Does This Project Move the Organization Toward Its Strategic Goals and Objectives? | p. 111 |
| Measure | |
| Measurement Reliability and Validity | p. 113 |
| Dimension Measurement Analysis | p. 113 |
| Attribute Measurement Analysis | p. 115 |
| Analyze | p. 119 |
| Quantify the Current Process | p. 119 |
| Catalog of Data Sources for This Process | p. 119 |
| Exploratory Data Analysis | p. 121 |
| Descriptive Data Analysis | p. 122 |
| Example of Using Worksheet | p. 124 |
| Quantify the Capability of the Current Process | p. 125 |
| Conduct a Process Audit | p. 125 |
| Prepare an Audit Report | p. 129 |
| Determine Sigma and DPMO Levels CTx's | p. 129 |
| Process Capability and Process Actual Sigma Levels Continuous CTx Characteristics | p. 129 |
| Measuring Process Capability for Variables Data | p. 129 |
| Measuring Actual Process Performance for Variables Data | p. 130 |
| Process Capability and Process Actual Sigma Levels for Attribute CTx Characteristics | p. 131 |
| Measuring Process Capability for Attributes Data | p. 132 |
| Measuring Actual Process Performance for Variables Data | p. 132 |
| Improve | p. 139 |
| Optimize the Process | p. 139 |
| Perform Designed Experiments | p. 141 |
| What Will the Future State Be? | p. 144 |
| What are the Best Practices in This Area? | p. 144 |
| Create a Future State Process Map | p. 150 |
| Six Sigma Project Activities Template | p. 152 |
| Presentation and Acceptance of Deliverables | p. 154 |
| Control | p. 157 |
| Control Failure Mode and Effect Analysis (FMEA) | p. 157 |
| Business Process Control Systems | p. 159 |
| How Will We Maintain the Gains Made? | p. 159 |
| A Tutorial on Project Selection and Management | p. 165 |
| Choosing the Right Projects | p. 165 |
| Customer Value Projects | p. 166 |
| Using QFD to Link Six Sigma Projects to Strategies | p. 166 |
| The Strategy Deployment Plan | p. 168 |
| Using Customer Demands to Design For Six Sigma | p. 174 |
| Structured Decision-Making | p. 175 |
| Shareholder Value Projects | p. 184 |
| Other Six Sigma Projects | p. 184 |
| Analyzing Project Candidates | p. 184 |
| Other Methods of Identifying Promising Projects | p. 184 |
| Using Pareto Analysis to Identify Six Sigma Candidates | p. 185 |
| Throughput-Based Project Selection | p. 186 |
| Multitasking and Project Scheduling | p. 190 |
| Critical Chain Project Portfolio Management | p. 191 |
| Summary and Preliminary Project Selection | p. 192 |
| Tracking Six Sigma Results | p. 194 |
| Financial Results Validation | p. 196 |
| Types of Savings | p. 196 |
| Lessons Learned: Capture and Replication | p. 196 |
| Appendices | p. 199 |
| Issues List | p. 200 |
| Risk Control Plan | p. 202 |
| Quality Plan | p. 203 |
| Cost Control Plan | p. 204 |
| Schedule Control Plan | p. 205 |
| Project Change Control Plan | p. 206 |
| Audit Report | p. 207 |
| Business Process Change Control Plan | p. 208 |
| Resource Calendars | p. 209 |
| Attribute Measurement Error Analysis | p. 210 |
| Calculating Yields | p. 224 |
| Normalized Yield and Sigma Level | p. 227 |
| Analytic Hierarchy Process (AHP) Using MS Excel | p. 230 |
| Additional Resources on Six Sigma Project Management | p. 232 |
| Figures | |
| The Six Sigma Project Process Flow | p. xv |
| Map of Six Sigma Project Flow | p. xvii |
| Six Sigma Project DMAIC Cycle Questions | p. xviii |
| Example of Project Validation Analysis | p. 6 |
| Example of Cost-Benefit Opportunity Calculations | p. 20 |
| WBS Creation Process Flowchart | p. 29 |
| Example of a WBS | p. 30 |
| Types of Activity Dependencies | p. 38 |
| Gantt Chart of Schedule | p. 42 |
| Gantt/Milestone Chart of Actual vs. Scheduled Performance | p. 42 |
| Example of Computer Gantt/Milestone Chart | p. 43 |
| Example of Network Diagram | p. 48 |
| Example of a Computer-Generated Network Diagram | p. 49 |
| Example of a Computer-Generated Human Resource Calendar | p. 52 |
| Computer Screen for Entering Task Duration Data | p. 63 |
| Results of Simulation for Example | p. 64 |
| Simulation Results: Probability of Meeting Due Date | p. 65 |
| Example of Cross-Functional Process Map | p. 95 |
| Define Gate Criteria | p. 112 |
| Measure Gate Criteria | p. 118 |
| Some EDA Techniques | p. 121 |
| Example of Combined DDA and EDA Analysis | p. 122 |
| Example of Evaluating a Hypothesis | p. 124 |
| Analyze Gate Criteria | p. 137 |
| Example of a Future State Process Map | p. 150 |
| Improve Gate Criteria | p. 156 |
| Control Gate Criteria | p. 164 |
| Strategy Deployment Plan | p. 167 |
| Strategy Deployment Matrix | p. 168 |
| QFD Relationship Weights and Symbols | p. 169 |
| Phase II Matrix: Differentiators | p. 171 |
| Phase III Matrix: Six Sigma Projects | p. 173 |
| Linkage Between Six Sigma Projects and Stakeholders | p. 174 |
| Customer Demand Model | p. 178 |
| Matrix of Categories for Pairwise Comparisons | p. 180 |
| Completed Top-Level Comparison Matrix | p. 181 |
| A Simple Process with a Constraint | p. 187 |
| Critical Chain Scheduling Illustration | p. 193 |
| Lithography Inspection Station Table, Stool, and Magnifying Glass | p. 215 |
| Attribute Gauge R&R Dialog Box and Data Layout | p. 219 |
| MINITAB "Agreement Within Appraiser" | p. 220 |
| Plot of "Agreement Within Appraiser" | p. 220 |
| MINITAB "Agreement of Appraiser with Standard" | p. 221 |
| Plot of "Agreement of Appraiser with Standard" | p. 221 |
| MINITAB "Appraiser Disagreement" | p. 222 |
| MINITAB "Agreement Between Appraisers" | p. 222 |
| MINITAB "Assessment vs. Standard Agreement Across All Appraisers" | p. 223 |
| Excel Spreadsheet for RTY | p. 225 |
| Excel Spreadsheet for Calculating Normalized Yield | p. 227 |
| Finding RTY Using Simulation Software | p. 229 |
| Tables | |
| Instructions for Completing the Project Charter Statement Form | p. 4 |
| Strategies for Meeting the Project Goals | p. 24 |
| Tools Useful in Risk Assessment | p. 75 |
| Risk Planning vs. Impact and Likelihood of Threatening Events | p. 75 |
| Risk Response Planning Tools | p. 78 |
| FMEA Severity, Likelihood, Detectibility Rating Guidelines | p. 102 |
| FMEA Information | p. 104 |
| Phases in Process Optimization | p. 141 |
| Typical DMAIC Project Tasks and Responsibilities | p. 152 |
| Local and Global Importance Weights | p. 182 |
| Example of Using Global Weights in Assessing Alternatives | p. 183 |
| Dysfunctional Process Symptoms and Underlying Diseases | p. 185 |
| Illustration of the Pareto Priority Index (PPI) | p. 186 |
| Throughput Priority of CTx Projects That Affect the Constraint | p. 189 |
| Project Throughput Priority vs. Project Focus | p. 189 |
| Possible Information to Be Captured | p. 195 |
| A Typical View of Six Sigma Projects | p. 195 |
| Attribute Measurement Concepts | p. 210 |
| Methods of Evaluating Attribute Inspection | p. 213 |
| Results of Lithography Attribute Inspection Study | p. 215 |
| Inspector Accuracies | p. 216 |
| Repeatability and Pairwise Reproducibility for Both Days Combined | p. 216 |
| Stability Analysis | p. 217 |
| Calculations Used to Find RTY | p. 224 |
| Worksheets | |
| Project Charter Statement | p. 2 |
| Project Validation Analysis | p. 7 |
| Six Sigma Project Evaluation | p. 9 |
| Six Sigma Project Evaluation Guidelines | p. 10 |
| Project Budget Development | p. 17 |
| Deliverables Metrics | p. 19 |
| Dollar Opportunity Estimate | p. 21 |
| Project Progress Satisfaction Metrics | p. 23 |
| Human Resources Assessment | p. 26 |
| Project Resource Planning | p. 28 |
| Project Work Breakdown Structure | p. 31 |
| List of Penalties for Missing Deadline | p. 33 |
| Major Milestones and Target Dates | p. 34 |
| Historical Research Summary | p. 36 |
| Constraint Analysis | p. 37 |
| Activity Dependenciesa | p. 39 |
| Activity Duration Estimates | p. 41 |
| List of Activities | p. 44 |
| Project Gantt/Milestone Chart Template | p. 45 |
| Project Gantt/Milestone Chart (Freehand Drawing Format) | p. 46 |
| Network Diagram for Project | p. 50 |
| Resource Availability Information | p. 53 |
| Schedule Improvement Evaluation | p. 55 |
| Best-Case, Expected, and Worst-Case Schedule Completion Dates | p. 59 |
| Statistical Analysis of Project Duration | p. 62 |
| Estimated Cost by Activity Duration | p. 67 |
| Cost-Optimization Spreadsheet Results | p. 68 |
| Cost-Optimization Graphical Analysis | p. 69 |
| Resource Leveling | p. 71 |
| Risk Event Classification | p. 76 |
| New Opportunities | p. 77 |
| Risk Response Plans | p. 79 |
| Quality Plan Items | p. 82 |
| Project Budget Reports and Reporting Frequency | p. 86 |
| Activity Status Management Report | p. 89 |
| Change Control Information | p. 90 |
| Controlled Documents List | p. 90 |
| Current Process Map | p. 96 |
| Narrative Description of Undesirable Effects | p. 96 |
| Undesirable Effects | p. 99 |
| FMEA Worksheet | p. 105 |
| CTQ Characteristics | p. 108 |
| CTS and CTC Characteristics | p. 109 |
| Other Key Factors and Metrics | p. 110 |
| Linkages to Enterprise Strategic Goals | p. 111 |
| Gauge R&R Results | p. 114 |
| Attribute Inspection System Results | p. 116 |
| Attribute Inspection Results by Inspector | p. 117 |
| Information Resource Catalog | p. 120 |
| DDA/EDA-Based Theories to Investigate Further | p. 123 |
| Process Audit Check Sheet | p. 126 |
| Actual CTx DPMO and Sigma Levels | p. 134 |
| Capability Levels of Performance | p. 135 |
| Rolled Throughput Yield Analysis | p. 136 |
| Optimum Levels of Performance | p. 142 |
| Optimum Rolled Throughput Yields | p. 143 |
| Benchmarking Step 1: Identify What Is to Be Benchmarked | p. 144 |
| Benchmarking Step 2: Identify Comparative Companies | p. 145 |
| Benchmarking Step 3: Determine Data Collection Methods | p. 146 |
| Benchmarking Step 4: Collect Data on Benchmark | p. 147 |
| Benchmarking Step 5: Determine the Current Performance Gap | p. 148 |
| Benchmarking Step 6: Identify Causes of the Performance Gap | p. 148 |
| Benchmarking Step 7: Estimate Future Performance Levels | p. 149 |
| Benchmarking Step 8: Establish Functional Goals and Gain Acceptance of Stakeholders | p. 149 |
| Alternative Future State Process Maps | p. 151 |
| Future State Improvement Estimates | p. 151 |
| Deliverables Acceptance Report | p. 155 |
| Control FMEA Worksheet | p. 158 |
| Additional Business Process Change Control Mechanisms | p. 162 |
| Project Assessment Summary | p. 194 |
| Issues List | p. 200 |
| Rolled Throughput Yields Worksheet | p. 226 |
| Table of Contents provided by Rittenhouse. All Rights Reserved. |