| Gemini 12 News Releases--November 3, 1966 | |
| MSC 66-46--June 17, 1966 | p. 10 |
| MSC 66-71A--September 27, 1966 | p. 11 |
| MSC 66-78--October 10, 1966 | p. 12 |
| Ames 66-15--November 7, 1966 | p. 14 |
| Ames 66-16--November 5, 1966 | p. 17 |
| Gemini 12 Press Kit--November 3, 1966 | |
| General Release | p. 21 |
| Preflight Activities and Integrated Countdown | |
| Launch Vehicle Countdown | p. 23 |
| Reentry | p. 23 |
| Mission Description | |
| Launch | p. 24 |
| Rendezvous | p. 24 |
| Agena PPS Maneuver | p. 25 |
| First Stand-up EVA | p. 25 |
| Umbilical Extravehicular Activity | p. 25 |
| Station-Keeping Exercise | p. 26 |
| Solar Eclipse Phasing | p. 26 |
| Second Stand-up EVA | p. 26 |
| Retrofire and Reentry | p. 26 |
| Experiments | p. 27 |
| Cameras | p. 33 |
| Crew Provisions and Training | |
| Crew Training Background | p. 33 |
| Gemini 12 Suits | p. 34 |
| Extravehicular Life Support System (ELSS) | p. 34 |
| Medical Checks | p. 35 |
| Body Waste Disposal | p. 35 |
| Water Measuring System | p. 35 |
| Food and Flight Menu | p. 35 |
| Manned Space Flight Tracking Network | |
| Mission Requirements | p. 36 |
| Real Time Computer Complex (RTCC) | p. 36 |
| Tracking | p. 36 |
| Ground Communications | p. 39 |
| Network Responsibility | p. 39 |
| Network Configuration | p. 40 |
| Abort and Recovery | |
| Crew Safety | p. 40 |
| Planned and Contingency Landing Areas | p. 41 |
| Spacecraft and Launch Vehicles | |
| Gemini Spacecraft | p. 41 |
| Gemini Launch Vehicle | p. 43 |
| Agena Target Vehicle | p. 44 |
| Atlas Launch Vehicle | p. 45 |
| Crew Biographies | p. 46 |
| Previous Gemini Flights | p. 48 |
| Project Officials | p. 51 |
| Spacecraft Contractors | p. 52 |
| Approximate Times of Major Events | p. 53 |
| Gemini 12 Summary Operations Plan--October 31, 1966 | p. 59 |
| Gemini Program; Record of Accomplishments--January 17, 1967 | p. 66 |
| Gemini 12 Technical Debriefing--November 22, 1966 | |
| Countdown | |
| Crew Ingress | p. 74 |
| Communications | p. 74 |
| ECS | p. 74 |
| Prelaunch Checkout | p. 75 |
| Launch Azimuth Update | p. 75 |
| Powered Flight | |
| Lift-off | p. 75 |
| Roll Program | p. 76 |
| Pitch Program | p. 76 |
| ECS | p. 76 |
| DCS Updates | p. 76 |
| Engine I Operation | p. 76 |
| Engine 2 Status | p. 76 |
| BECO | p. 76 |
| Staging | p. 76 |
| Engine 2 Ignition | p. 77 |
| RCS Initiate | p. 77 |
| Steering | p. 77 |
| Go/No Go | p. 77 |
| Systems Status | p. 77 |
| SECO | p. 77 |
| Communications | p. 77 |
| Insertion | |
| Post SECO | p. 77 |
| SECO Plus 20 Seconds | p. 78 |
| Insertion Checklist | p. 79 |
| Orbital Operations | p. 80 |
| Retrofire | |
| T[subscript r]-256 Checklists | p. 162 |
| T[subscript r]-0 | p. 164 |
| Reentry | |
| Reentry Update | p. 164 |
| Attitude Control Modes | p. 165 |
| Reentry Control Technique | p. 165 |
| Guidance | p. 166 |
| Drogue Chute Deployment | p. 166 |
| Main Chute Deployment | p. 168 |
| Landing and Recovery | |
| Impact | p. 168 |
| Communications | p. 169 |
| Postlanding Spacecraft Status | p. 169 |
| Comfort | p. 170 |
| Recovery Team | p. 170 |
| Crew Egress | p. 170 |
| Survival Gear | p. 170 |
| Crew Pickup | p. 170 |
| Systems Operations | |
| Platform | p. 170 |
| OAMS | p. 171 |
| RCS | p. 174 |
| ECS | p. 175 |
| Communications | p. 184 |
| Electrical | p. 185 |
| On-board Computer | p. 186 |
| Radar | p. 187 |
| Crew Station | p. 188 |
| Spacecraft Exterior | p. 192 |
| Visual Sightings | |
| Countdown | p. 192 |
| Powered Flight | p. 192 |
| Orbital Flight | p. 193 |
| Retrofire and Reentry | p. 196 |
| Experiments | |
| Frog Egg Growth | p. 197 |
| Synoptic Terrain Photography | p. 197 |
| Airglow Horizon Photography S-11 experiment | p. 198 |
| Micrometeorite Collection S-12 | p. 198 |
| UV Astronomical Camera S-13 | p. 198 |
| Libration Regions Photography S-29 | p. 199 |
| Sodium Vapor Clouds S-51 | p. 199 |
| Tri-Axis Magnetometer (M-405) | p. 200 |
| Beta Spectrometer (M-408) | p. 200 |
| Bremsstrahlung Spectrometer (M-409) | p. 200 |
| Manual Navigation Sightings (T-2) | p. 200 |
| Premission Planning | |
| Mission Planning | p. 202 |
| Experiments | p. 203 |
| Mission Control | p. 204 |
| Training | |
| Gemini Mission Simulator | p. 206 |
| Launch Abort Training | p. 206 |
| MAC Engineering simulators | p. 207 |
| Translation and docking trainer | p. 207 |
| Planetarium | p. 207 |
| Systems Briefing | p. 208 |
| Spacecraft Systems Status | p. 209 |
| Egress Training | p. 209 |
| Launch Simulations | p. 209 |
| Reentry Simulation | p. 210 |
| Simulated Network Simulation | p. 210 |
| Zero "G" Flights | p. 210 |
| Underwater Zero "G" | p. 210 |
| MSC Altitude Chamber | p. 210 |
| Gemini Crew Station Mockup | p. 211 |
| Gemini Adapter Mockup | p. 212 |
| Agena Mockup | p. 212 |
| Sextant Training Equipment | p. 212 |
| Camera Training Equipment | p. 212 |
| Rendezvous Concept for Circumlunar Flyby in 1967 | |
| Index | p. 215 |
| Table of Contents provided by Ingram. All Rights Reserved. |