Get Free Shipping on orders over $0
Construction Scheduling, Cost Optimization and Management - Hojjat Adeli

Construction Scheduling, Cost Optimization and Management

By: Hojjat Adeli, Asim Karim

Hardcover | 25 January 2001 | Edition Number 1

At a Glance

Hardcover


RRP $462.00

$394.75

15%OFF

or 4 interest-free payments of $98.69 with

 or 

Ships in 3 to 5 business days

In an increasingly competitive environment, construction professionals must ensure that efficient schedules are kept and that costs are kept to a minimum. Presenting a groundbreaking new construction scheduling model, CONSCOM, this book provides the solution to effective construction scheduling and cost optimization. Cost Scheduling, Cost Optimization and Management presents a general mathematical formulation for the scheduling of construction projects. Using this formula, repetitive and non-repetitive tasks, work continuity considerations, multiple-crew strategies, and the effects of varying job conditions on the performance of a crew can be modelled. The authors show that for any given construction duration, the CONSCOM model automatically yields the optimum construction schedule for minimum construction cost. By varying the construction duration, readers are shown how to solve the cost-duration trade-off construction cost. The model provides features desirable for repetitive projects such as highway construction and allows schedulers greater flexibility. It is particularly suitable for studying the effects of change on the construction cost. This book presents an entirely new approach to the construction scheduling problem. It provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization, including construction engineers, highway engineers, transportation engineers, contractors and architects. It will also be useful for researchers, and graduates on courses in construction scheduling and planning.
Industry Reviews
'Here is a practical guide for those involved in the construction industry, including engineers, contractors, and project managers.'- Business Review May-June 2002

More in Building Construction & Materials

Gas Services : 3rd Edition - Owen Smith

Spiral Ringed Book

RRP $109.95

$84.75

23%
OFF
The Art of Japanese Joinery - Kiyosi Seike

RRP $54.99

$42.75

22%
OFF
Building Construction Illustrated - Francis D. K. Ching

RRP $97.95

$69.75

29%
OFF
Sanitary and Drainage : 3rd Edition - Basic Plumbing Services Skills. 3rd Edition - Peter Wenning
Fundamentals of Building Construction : Materials and Methods - Edward Allen
Basic Plumbing Skills : 4th Edition - Dean Carter

RRP $97.95

$84.75

13%
OFF
The Art of the Stonemason - Ian Cramb

RRP $47.99

$39.75

17%
OFF
Chudley and Greeno's Building Construction Handbook - Karl  Kovac
Metric Handbook 7ed : Planning and Design Data - Pamela  Buxton

RRP $108.00

$82.75

23%
OFF
Self Build And Renovation For Dummies : For Dummies - Nicholas Walliman
Steel Designers' Handbook : 8th edition - Branko E. Gorenc

RRP $99.99

$86.75

13%
OFF
Data-driven BIM for Energy Efficient Building Design : 1st Edition - Saeed Banihashemi
Introduction to Finite Element Analysis Using MATLAB® and Abaqus - Amar  Khennane
The AI Engineering Bootcamp : Build, Ship, Share - Greg Loughnane

RRP $107.95

$75.75

30%
OFF