| Preface to the Fifth Edition | p. viii |
| Preface to the First Edition | p. xi |
| Tank Vessel Design and Classification | |
| Oil Tanker | p. 1 |
| Parcel Tanker | p. 10 |
| Combination Carrier | p. 13 |
| Barges | p. 16 |
| Barriers | p. 22 |
| Classification | p. 24 |
| Development of the Supertanker | p. 26 |
| Review | p. 27 |
| Cargo Characteristics | |
| Bulk Liquid Cargoes | p. 29 |
| Properties of Petroleum | p. 30 |
| Flammability Characteristics of Bulk Liquid Cargoes | p. 31 |
| Avoidance of the Flammable Range | p. 33 |
| Classification of Petroleum | p. 35 |
| Cargo Weight, Capacity, and Flow | p. 36 |
| Toxicity-Measurement and Regulations | p. 39 |
| Sources of Cargo Information | p. 41 |
| Hazards | p. 44 |
| Review | p. 52 |
| Chemical Tankers | |
| Chemical Cargoes and Classifications | p. 54 |
| Chemical Tanker Design and Operations | p. 58 |
| Ship Operations | p. 63 |
| Regulations Affecting the Chemical Tanker | p. 66 |
| Review | p. 69 |
| Cargo Piping Systems | |
| Bottom Piping | p. 70 |
| Deck Piping | p. 78 |
| Cargo Hoses | p. 87 |
| Cargo Transfer | p. 89 |
| Pumproom Piping | p. 93 |
| Basic Valve Types | p. 95 |
| Special Valves | p. 99 |
| Blanks | p. 103 |
| Review | p. 106 |
| Venting Systems and Vapor Control Operations | |
| Controlled Venting Systems | p. 108 |
| Development of Vapor Control Systems | p. 113 |
| Vapor Control System Components | p. 114 |
| Closed Gauging | p. 117 |
| High/Low Vapor Pressure Protection | p. 121 |
| Operations | p. 122 |
| Review | p. 130 |
| Cargo Measurement and Loss Control | |
| The Purpose of Cargo Measurement | p. 131 |
| Parties Involved | p. 132 |
| Terms of Sale | p. 132 |
| Measurement Equipment | p. 133 |
| Equipment Use | p. 143 |
| Tank Structure and Measurement | p. 143 |
| Measurement Procedures | p. 144 |
| Preloading Inspection and Measurement | p. 148 |
| Postloading Inspection and Measurement | p. 149 |
| Predischarge Inspection and Measurement | p. 153 |
| Postdischarge Inspection and Measurement | p. 153 |
| Loss Control | p. 154 |
| Vessel Experience Factor | p. 156 |
| Review | p. 161 |
| Cargo Calculation | |
| Cargo Planning | p. 164 |
| Load Lines and Zone Limitations | p. 168 |
| Cargo Terms | p. 171 |
| Loading to Final Draft | p. 177 |
| Loading and Discharging Rates | p. 177 |
| Calculating Vessel Experience Factor (VEF) | p. 178 |
| Cargo Loading Software | p. 179 |
| Review | p. 187 |
| Cargo Pumps | |
| Kinetic Pumps | p. 196 |
| Pump Operation | p. 204 |
| Positive-Displacement Pumps and Eductors | p. 212 |
| Review | p. 216 |
| Cargo Transfer Operations | |
| Regulations | p. 218 |
| Operations | p. 236 |
| Topping-Off Operation | p. 242 |
| Finishing Cargo Loading | p. 243 |
| Offshore Terminals | p. 246 |
| Discharging Operation | p. 248 |
| Review | p. 254 |
| Chartering and Operations | |
| Vessel Ownership | p. 255 |
| Types of Charter Agreements | p. 256 |
| The Charter Party | p. 257 |
| Terms of the Charter Party | p. 258 |
| Pricing | p. 266 |
| Freight Rate | p. 267 |
| Review | p. 270 |
| Vetting Inspections | |
| Inspections | p. 271 |
| The Crew's Role in Vetting | p. 273 |
| A Guide to Vetting Inspections | p. 274 |
| The Inspection | p. 277 |
| Review | p. 278 |
| Ballasting and Deballasting Operations | |
| Ballasting Operations | p. 280 |
| Deballasting Operations | p. 284 |
| Review | p. 290 |
| Tank Cleaning Operations | |
| Equipment | p. 293 |
| Crude-Oil-Washing (COW) | p. 301 |
| Supplemental Cleaning | p. 308 |
| Tank Coatings | p. 308 |
| Review | p. 311 |
| Pollution Regulations | |
| Sources of Pollution from Tank Vessels | p. 313 |
| Federal Pollution Legislation | p. 314 |
| International Pollution Legislation, MARPOL | p. 316 |
| Pollution Reduction Efforts | p. 323 |
| Review | p. 323 |
| Enclosed Space Entry | |
| Risks Associated with Enclosed Space Entry | p. 325 |
| Gas-Freeing Process | p. 329 |
| Testing | p. 331 |
| Entry Procedure | p. 335 |
| Instrumentation | p. 338 |
| Review | p. 343 |
| Inert Gas Systems | |
| Sources of Inert Gas | p. 345 |
| General Requirements for an Inert Gas System | p. 347 |
| Flue Gas System Components | p. 347 |
| Emergency Procedures | p. 361 |
| Gas Replacement | p. 361 |
| Inert Gas Generators | p. 363 |
| Nitrogen Systems | p. 372 |
| Precautions in the Use of IG Systems | p. 374 |
| Review | p. 375 |
| Emergency Procedures | |
| Pumproom Rescue | p. 377 |
| Oil Spill | p. 378 |
| Grounding | p. 379 |
| Collision | p. 380 |
| Fire-General Guidelines | p. 380 |
| Fire-Cargo Manifold | p. 381 |
| Fire-Mast or King Post Vent | p. 381 |
| Fire-Cargo Pumproom | p. 382 |
| Appendices | |
| Material Safety Data Sheet (MSDS) | |
| On enclosed disc | |
| MT Petrolab Reference Tables | |
| On enclosed disc | |
| Cargo Max Section | |
| On enclosed disc and also in text Chapter 7 | p. 179 |
| International Ship/Shore Safety Checklist | |
| On enclosed disc | |
| Cargo Resistance Guide | |
| On enclosed disc | |
| Conversion Factors | |
| Also on enclosed disc | p. 384 |
| CargoMax VLCC Software | |
| On enclosed disc | |
| USCG Incompatibility Chart | |
| On enclosed disc and also in text Chapter 2 | |
| Glossary | p. 386 |
| Bibliography | p. 400 |
| Index | p. 403 |
| Table of Contents provided by Ingram. All Rights Reserved. |